Bayou LeCarpeMaintenance Dredging
USACE
Prime Contractor: Intergrated Pro Services
Project consisted of hydraulically dredging approximately 60,000 cubic yards of material. Construction and maintenance of containment dikes.
Contract Sum: $736,000.00 Year 2009
Contact Person: Ryan Hess 504-329-2003
CDC is currently operating 3 hydraulic dredges along the Gulf Coast and 1 dredge in Cartagna, Colombia
Plaquemines Parish Fringe Marsh Repair Project
Plaquemines Parish Government
Plaquemines Parish, La.
Project consisted of hydraulically dredging approximately 1,000,000 cubic yards of material to create several marsh fill areas throughout Plaquemines Parish.CDC provided all of the surveying and installation of the staff gauges throughout all of the fill sites. CDC was responsible for constructing and maintaining over 10,000 linear feet of containment dikes along with several water control structures.
Contract Sum: $5,200,000.00 Year 2013/2014
Contact Person: Stephen Lungren 504-836-8190
Port Eads Reconstruction Channel and Marina Dredging
Prime Contractor: Couvillion Group, LLC
Plaquemines Parish Government/FEMA
Plaquemines Parish, La.
Project consisted of removing and disposing of storm debris and hydraulically dredging approximately 45,000 cubic yards of material to create marsh habitat.
Contract Sum: $667,575.00 Year 2012
Contact Person: Mike Roy 504-656-8243
Bayou Terrebonne Flood Control Improvements Phase 1A and 1B
Terrebonne Parish Consolidated Government
Terrebonne Parish, La.
Project consisted of hydraulically dredging approximately 75,000 cubic yards of material and disposing it in an upland disposal area approximately 12,000 feet of pumping distance. The project also consisted of constructing the disposal area and clearing and grubbing along Bayou Terrebonne.
Contract Sum: $3,266,452.00 Year 2011
Contact Person: Hillary Thibodeaux 985-868-3434
LASHIP Dredging Improvements
Terrebonne Port Commission
Terrebonne Parish, La.
Project consisted of hydraulically dredging approximately 400,000 cubic yards of material, construction and maintenance of containment levees. Clearing and grubbing the entire 60 acre disposal and installing weir boxes.
Contract Sum: $2,777,53.00 Year 2010
Contact Person: David Rabalis 985-873-6423
Colonial Pipeline Marsh Restoration Project
Lake Lery
Project consisted of building approximately 3,000lf of Lake Rim Embankment and 4,000lf of containment dikes and hydraulically dredging approximately 250,000 cubic yards of material to replenish the marsh.
Project value: $5,000,000.00 Year 2017
Contact Person: Mandel Long
Below are some highlighted projects that were completed in the past years. CDC has completed over 600 projects since it was formed in 1996.
Pass-a-Loutre WMA Enhancement Project
DU-LA-14-5
Project consisted of building nesting habitat using hydraulically dredged spoils
Project value: $1,250,000.00 Year 2016
Contact Person: John Hetherwick
coastal
South Lake Lery Shoreline and Marsh Restoration
(BS-16) NRCS
Project consisted of building approximately 30,000lf of Lake Rim Embankment and 46,000lf of containment dikes and hydraulically dredging approximately 3,500,000 cubic yards of material to replenish the marsh.
Project value: $25,000,000.00 Year 2016-2017